test

Our (Hypothetical) Strategy to Earn the EPD and Material Ingredient Reporting Credits for v4 Projects

Posted on 1 CommentPosted in EPDs, LEED, LEED Certified, LEED Construction, LEED Documentation, LEED v4

Who would have thought how much stress and headache LEED v4 would be causing design and construction teams as they are forced to scramble to find some of the few hundred products that have EPDs, HPDs, C2Cs? Actually, most people. That’s why in addition to EPD/HPD, you need to BYOB. The Badger got curious and […]






Easiest way to document IAQ management during construction – ever!

Posted on Leave a commentPosted in IEQc3.1, LEED Certified, LEED Construction, LEED Documentation

So we’ve talked in the past about successfully documenting IEQc3.1, but still see the same challenges week after week. Here’s what should happen and what does happen. Should happen – IAQ management plan has been developed AND given to the subs. once the building is getting near dried in (or HVAC equipment starts to show […]



Whoever said the more the merrier wasn’t talking about LEED submittals…

Posted on Leave a commentPosted in LEED, LEED Construction, LEED Documentation, MRc4, Recycled Content

197 pages… I’ve read books shorter than 197 pages. What was it – the latest cutting edge green building journal? The newest tweener vampire book? The beer list at Hops and Barley? None of the above – it was the submittal that was sent in when LEED documentation for hollow metal doors and frames was requested. […]